IML Label Misalignment: 7 Causes and How to Fix Them
HecosTech IML Automation Talk to an IML Expert LABEL POSITIONING Stable IML label positioning depends on the robot, tooling, label condition, mold, retention method, and molding process working together. Small variations in any part of the system can result in visible label shift or rotation on the finished product. Explore IML Solutions Discuss Your Project […]
IML Robot Cycle Time: 7 Factors That Affect Production Speed
HecosTech IML Automation Talk to an IML Expert CYCLE TIME CONTROL IML robot cycle time depends on more than robot speed. Mold opening, robot travel, label placement, product takeout, machine signals, tooling, and downstream handling must work together to achieve a fast and stable production cycle. Explore IML Solutions Discuss Your Project IML robot cycle […]
Agricultural Drone Plastic Parts for UAV Manufacturing
HecosTech IML Automation Talk to an IML Expert AGRICULTURAL UAV PLASTIC PARTS HecosTech supports agricultural drone projects with custom plastic components, injection molds, molded part production and automated takeout solutions. Explore Plastic Parts Discuss Your Project Demand for agricultural UAVs continues to expand as drones are used for spraying, spreading, surveying and other farm operations. […]
Injection Mold Maintenance Planning and Records
Plan injection mold maintenance using tool records, service intervals, condition checks and restart responsibilities. Define the scope before handover.
IML Label Artwork: Dielines and Proof Approval
Prepare IML label artwork around the container dieline, print proof and molded sample. Clarify revisions and approval scope before label production.
Injection Mold Trial Samples and Production Approval
Review injection mold trial samples against drawings, appearance, assembly and agreed test conditions. Define open issues and approval scope before production.
PET Preform Takeout and Post-Mold Cooling
Plan PET preform takeout around cavity layout, tooling, mold access and cooling hand-off. See what to confirm before matching the robot to your production line.
IML Robot Changeover: Mold, Label and Tooling Checks
Review an IML robot format change as a connected mold, label, tooling, machine and downstream application. Prepare the current and proposed specifications before confirming compatibility.